3.. 地基

Components, costs and activities that are directly linked to the plot. This refers to the actual (physical) plot. Category 3 - plot- includes all activities and construction components that are independent from the building (category 4 and 5) and can be used separately, for instance, traffic routes, supply pipes and cables until entering the building as well as plot equipment and facilities (wall, sandboxes, park benches). Costs directly linked to the plot, e.g. purchasing price, taxes, etc. can be found in category 1.
参考单位平方米
最低价格 0.2 € (欧元)
平均价格 0 € (欧元)
最高价10000 € (欧元)
0 EUR / 0 GBP / 0 JPY / 0 USD / 0 ARS / 0 AUD / 0 BRL / 0 CAD / 0 CHF / 0 CNY / 0 DKK / 0 IDR / 0 INR / 0 MXN / 0 MYR / 0 NOK / 0 RUB / 0 TRY /
永久链接/直接地址:  zh/建筑成本和组件/价格/地基_50751.htm