العربيةbahasa indonesia中国danskedeutschenglishespañolfrançaisעבריתहिन्दीitaliano日本語norskeportuguêsрусскийsuomalainensvenskatürkçe

1.14. vergi, sübvansiyon ve hibe

All expenses that have an impact on the construction project (due to political will). This can be the case in the form of charges, e.g. taxes, or financial grants, e.g. paying subsidies.
referans birimyüzde
minimum fiyat 6.15 $ (Dolar )
ortalama fiyat 18.45 $ (Dolar )
maksimum fiyat30.75 $ (Dolar )
15 EUR / 13.35 GBP / 1950.3 JPY / 18.45 USD / 93.75 ARS / 23.85 AUD / 60.15 BRL / 23.85 CAD / 17.25 CHF / 117 CNY / 111.75 DKK / 254062.65 IDR / 1201.95 INR / 348.9 MXN / 72.15 MYR / 144.45 NOK / 1054.5 RUB / 70.35 TRY /
permalink / direkt adresi:  tr/inşaat maliyetleri ve bileşenler/fiyat/vergi, sübvansiyon ve hibe _50479.htm