العربيةbahasa indonesia中国danskedeutschenglishespañolfrançaisעבריתहिन्दीitaliano日本語norskeportuguêsрусскийsuomalainensvenskatürkçe

2.1.4 sökmek

Expenses regarding the demounting of individual construction parts. Mainly industrial plants or special constructions, such as conservatories/winter gardens and technical equipment, such as fuel oil tanks, oil separators, industrial silos. En particular, this refers to contaminated parts or objects subject to special recycling procederes.
referans birimmetreküp
minimum fiyat 10 € (Euro)
ortalama fiyat 30 € (Euro)
maksimum fiyat70 € (Euro)
30 EUR / 26.7 GBP / 3900.6 JPY / 36.9 USD / 187.5 ARS / 47.7 AUD / 120.3 BRL / 47.7 CAD / 34.5 CHF / 234 CNY / 223.5 DKK / 508125.3 IDR / 2403.9 INR / 697.8 MXN / 144.3 MYR / 288.9 NOK / 2109 RUB / 140.7 TRY /
permalink / direkt adresi:  tr/inşaat maliyetleri ve bileşenler/fiyat/sökmek_50596.htm