العربيةbahasa indonesia中国danskedeutschenglishespañolfrançaisעבריתहिन्दीitaliano日本語norskeportuguêsрусскийsuomalainensvenskatürkçe

2.1.4 desmontagem

Expenses regarding the demounting of individual construction parts. Mainly industrial plants or special constructions, such as conservatories/winter gardens and technical equipment, such as fuel oil tanks, oil separators, industrial silos. En particular, this refers to contaminated parts or objects subject to special recycling procederes.
unidade de referênciametro cúbico
preço mínimo 10 € (Euro)
preço médio 30 € (Euro)
preço máximo70 € (Euro)
30 EUR / 26.7 GBP / 3900.6 JPY / 36.9 USD / 187.5 ARS / 47.7 AUD / 120.3 BRL / 47.7 CAD / 34.5 CHF / 234 CNY / 223.5 DKK / 508125.3 IDR / 2403.9 INR / 697.8 MXN / 144.3 MYR / 288.9 NOK / 2109 RUB / 140.7 TRY /
permalink / endereço direto:  pt/custos de construção e componentes/preço/desmontagem_50596.htm