العربيةbahasa indonesia中国danskedeutschenglishespañolfrançaisעבריתहिन्दीitaliano日本語norskeportuguêsрусскийsuomalainensvenskatürkçe

3.. プロット

Components, costs and activities that are directly linked to the plot. This refers to the actual (physical) plot. Category 3 - plot- includes all activities and construction components that are independent from the building (category 4 and 5) and can be used separately, for instance, traffic routes, supply pipes and cables until entering the building as well as plot equipment and facilities (wall, sandboxes, park benches). Costs directly linked to the plot, e.g. purchasing price, taxes, etc. can be found in category 1.
リファレンスユニット平方メートル
最低価格 0.246 $ (ドル)
平均価格 0 $ (ドル)
最高価格12300 $ (ドル)
0 EUR / 0 GBP / 0 JPY / 0 USD / 0 ARS / 0 AUD / 0 BRL / 0 CAD / 0 CHF / 0 CNY / 0 DKK / 0 IDR / 0 INR / 0 MXN / 0 MYR / 0 NOK / 0 RUB / 0 TRY /
このエントリーのURL /直接アドレス:  ja/建設費とコンポーネントには、/価格/プロット_50751.htm