العربيةbahasa indonesia中国danskedeutschenglishespañolfrançaisעבריתहिन्दीitaliano日本語norskeportuguêsрусскийsuomalainensvenskatürkçe

3.. Terrain

Components, costs and activities that are directly linked to the plot. This refers to the actual (physical) plot. Category 3 - plot- includes all activities and construction components that are independent from the building (category 4 and 5) and can be used separately, for instance, traffic routes, supply pipes and cables until entering the building as well as plot equipment and facilities (wall, sandboxes, park benches). Costs directly linked to the plot, e.g. purchasing price, taxes, etc. can be found in category 1.
unité de référencemètre carré
prix minimum 0.246 $ (US-Dollar)
prix moyen 0 $ (US-Dollar)
prix maximum12300 $ (US-Dollar)
0 EUR / 0 GBP / 0 JPY / 0 USD / 0 ARS / 0 AUD / 0 BRL / 0 CAD / 0 CHF / 0 CNY / 0 DKK / 0 IDR / 0 INR / 0 MXN / 0 MYR / 0 NOK / 0 RUB / 0 TRY /
permalink / adresse directe:  fr/coûts de construction et composantse/Prix ​​/Terrain_50751.htm