العربيةbahasa indonesia中国danskedeutschenglishespañolfrançaisעבריתहिन्दीitaliano日本語norskeportuguêsрусскийsuomalainensvenskatürkçe

2.. Activités de construction

The main category of construction activities comprises all activities and expenditure carried out or incurred during the construction phase. Construction activities and the incurred expenses tend to be temporary in nature and will be removed once the construction activities are over. This category also includes material, tools and temporary equipment such as scaffolding.
unité de référencepour cent
prix minimum 5 € (Euro)
prix moyen 15 € (Euro)
prix maximum25 € (Euro)
15 EUR / 13.35 GBP / 1950.3 JPY / 18.45 USD / 93.75 ARS / 23.85 AUD / 60.15 BRL / 23.85 CAD / 17.25 CHF / 117 CNY / 111.75 DKK / 254062.65 IDR / 1201.95 INR / 348.9 MXN / 72.15 MYR / 144.45 NOK / 1054.5 RUB / 70.35 TRY /
permalink / adresse directe:  fr/coûts de construction et composantse/Prix ​​/Activités de construction_50583.htm